PROJECT ONE HUNDRED FIVE
Refurbishment of food production facility Refurbishment of food production facility Refurbishment of food production facility
Industrial facility in Dorset
Failing wired glass vertical glazing panels replaced with heavy weight Filon profiled panels to match the cladding.
 
PROJECT ONE HUNDRED FOUR
Refurbishment of food production facility Refurbishment of food production facility Refurbishment of food production facility
OPT Foods New Greenham Common Newbury
Refurbishment of food production facility
  Case Study
 
PROJECT ONE HUNDRED THREE
Refurbishment of warehouse and laboratories. Refurbishment of warehouse and laboratories. Refurbishment of warehouse and laboratories.
Biopharma Process Systems Winchester
Refurbishment of warehouse and laboratories.
  Case Study
 
PROJECT ONE HUNDRED TWO
Uv degraded PVC pyramid Rooflights replaced. Uv degraded PVC pyramid Rooflights replaced. Uv degraded PVC pyramid Rooflights replaced.
Ministry of Defence property rooflight replacement.
Uv degraded PVC pyramid Rooflights replaced.
  Case Study
 
PROJECT ONE HUNDRED ONE
Removal of redundant flues Removal of redundant flues Removal of redundant flues
ACW Technology, South Wales.
Removal of redundant flues and reweathereing of 47no. previously very poorly installed roof service penetrations
  Case Study
 
 
PROJECT ONE HUNDRED
Roof debris clearance Roof debris clearance Roof debris clearance
Precision Disc Castings Poole.
Roof debris clearance
  Case Study
 
PROJECT NINETY NINE
emergency repair emergency repair emergency repair
Genuine emergency repair, molten metal electricity and rain water do not mix!!
Failed rooflight directly over the electric melting area of the foundary
  Case Study
 
PROJECT NINETY EIGHT
Rooflight Replacement Rooflight Replacement Rooflight Replacement
Rooflight replacement Precision Disc Castings Poole.
30no. failed rooflights over the electric melting area of the foundary.
  Case Study
 
PROJECT NINETY SEVEN
Acoustic Sound Wall cladding installation Acoustic Sound Wall cladding installation Acoustic Sound Wall cladding installation
Acoustic Sound Wall cladding installation inside turbine assembly hall of Major PLC
The clients brief was to reduce Internal sound reverberation and increase thermal insulation values in their machinery assembly hall.
  Case Study
 
PROJECT NINETY SIX
Insulation upgrade Insulation upgrade Insulation upgrade
Private Landlord in Ringwood Hampshire.
Insulation upgrade and reroof of 880 sq. metres of a series of small business units.
  Case Study
 
PROJECT NINETY FIVE
Roof repair. Roof repair. Roof repair.
Precision Disc Castings Poole, Core Shop, Roof repair.
An existing triple skin asbestos cement sheeted roof had slipped due to failing rusted hook bolts. We stripped and resheeted the roof using Supa safe mesh reinforced GRP translucent sheeting fixed directed to the existing hot rolled steel purlins. Temporary internal netting and external scaffold was also provided.
  Case Study
 
PROJECT NINETY FOUR
Graffiti removal Graffiti removal Graffiti removal
Graffiti removal and over painting Test Valley Borough Council Industrial Estate.
A combination of removal and over painting was undertaken to return the shutter doors and brickwork of an industrial estae which had suffered significant and persistant graffiti problems when the units were vacant.
  Case Study
 
PROJECT NINETY THREE
Refurbishment of warehouse Refurbishment of warehouse Refurbishment of warehouse
Refurbishment of warehouse Ferndown, Dorset for Guernsey based investment company.
Replace 450sq.metres of asbestos sheeting
  Case Study
 
PROJECT NINETY TWO
Partly detached cappings flashings Partly detached cappings flashings Partly detached cappings flashings
Test Valley Borough Council Industrial Estate Andover.
Partly detached cappings flashings were replaced and impact damaged cladding replaced.
  Case Study
 
PROJECT NINETY ONE
Existing asbestos cement roof, cladding and guttering replaced Existing asbestos cement roof, cladding and guttering replaced Existing asbestos cement roof, cladding and guttering replaced
Industrial unit owned by private landlord
Existing asbestos cement roof, cladding and guttering replaced
  Case Study
 
PROJECT NINETY
Gutter relining Gutter relining Gutter relining
Tarmac Plant Hampshire Cladding repairs
Damaged obsolete profiled asbestos cement cladding in a trafford tile profile over clad with a blue tinted heavey weight GRP cladding of a matching profile. The works were undertaken using a cherry picker.
  Case Study
 
 
PROJECT EIGHTY NINE
Gutter relining Gutter relining Gutter relining
Gutter and fascia replacement Hendy Group Truck service and repair facility, Exeter, Devon.
110 linear metres Replaced with Brett Martin PVCu Industrial Cascade fixed through a new plastisol flashing into a new treated timber fascia which was fixed with hot rolled fixing directly into the main steel frame.
  Case Study
 
PROJECT EIGHTY EIGHT
Gutter relining Gutter relining Gutter relining
Chemical re-processing plant, Southampton.
60 Linear Metres of failed eaves gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
  Case Study
 
PROJECT EIGHTY SEVEN
Rooflight Replacement Rooflight Replacement
Rooflight Replacement
180 no. failed PVC rooflights replaced with Brett Martin Daylight Systems (factory assembled GRP rooflights) trilite fair 24 with a superlife finish, 2.4kg/sqm weight in fire grade SAB3/SAA1
  Case Study
 
PROJECT EIGHTY SIX
Amec Industrial Division. Milford Energy Ltd, Red Dragon Power Station, Milford Haven, Pembrokeshire, Wales.
Phase 1 of contract February 2008.
The sites project management found Waterrail Roofing Services via our web site. We were called to site to advise on a possible solution to a totally failed gutter in the turbine hall of the power station. 52 Linear Metres of boundary gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system. A galvanised steel flashing break pressed to match the existing profile was fixed in the sole of the gutter to prevent ponding and puncture by the existing totally failed gutter. 4no. outlets and 2no. stop ends and 2no. weir overflows were heat welded to the liner to create a joint and detail free gutter. Because the sole of the gutter was 500mm wide and the sites high exposure location holding down straps were also fixed at 2.0m centre to prevent wind uplifting the liner. Badly rusted roof sheeting which had been located beneath steam pipes were also overlaid with a matching profile and the total roof area was brush and petrol blower cleaned to remove an accumulation of debris.