%
If (Request.Form ("userId") <> "pps2008") then
response.redirect ("http://www.waterrail.co.uk")
end if
%>
Waterrail
Hendy Group Truck service and repair facility, Exeter, Devon
110 linear metres of failing asbestos cement gutter and 40 linear metres of downpipes replaced with Brett Martin PVCu Industrial Cascade 160mm diameter gutter and 110mm downpipes fixed through a new plastisol flashing into a new treated timber fascia which was fixed with hot rolled fixing directly into the main steel frame.